CORNING ONE GX Folha de instalação rápida - Página 13
Procurar online ou descarregar pdf Folha de instalação rápida para Instrumentos de medição CORNING ONE GX. CORNING ONE GX 14 páginas. Higher power 40 w dual-band wcs/2.5 ghz tdd das remote
Também para CORNING ONE GX: Manual de informações gerais (12 páginas)
13B. POWERING UP DC MODELS
IMPORTANT!
Verify the following before connecting DC power cable:
• DC power supplier must be turned off before performing the
power connections!
• DC cable supports required voltage and current specifications:
40-57 VDC and Max 37.5A;
• Maximum power consumption: 1450 W
• DC cable diameter range between 7 to 14 mm
• Cable lug specs:
– Hole size: 1/4 in
– Hole spacing: 5/8 in
Step 1:
Open DC power chamber by loosening the four
M3 screws. See Figure 16.
Step 2:
Referring to Figure 17, remove retaining nuts and
route power cord through provided tubing gaskets
noting the following:
• Tubing gasket is required for power cord
diameter in range of 7 to 10 mm
• Tubing gasket is not required for power cord
diameter in range of 10 to 14 mm
Step 3:
Carefully let power cord enter the chamber
(through hole) and connect the lug to terminal
(make sure right DC polar is connected).
Step 4:
Tighten remaining nuts.
Step 5:
Tighten lug to terminal with nut and washer
(Figure 18).
Step 6:
It is strongly recommended to secure the power
cords to the enclosure. Additional holes are
provided for this purpose. See Figure 19.
Corning Optical Communications
Figure 16. GX Quad Power Connector
Figure 17. Routing DC Power Cords
Figure 18. Tightening Lug to Terminal
Figure 19. Securing Power Cable
Quick Installation Sheet | CMA-581-AEN | Page 13