A.
Do not begin installation until substrates have been properly prepared.
B.
Verify required supports are correct.
C.
Verify electrical rough-in is at correct locations.
D.
If substrate preparation is the responsibility of another installer, notify Architect of
unsatisfactory preparation before proceeding.
PART 3 2PREPARATION
A.
Clean surfaces thoroughly prior to installation.
B.
Prepare surfaces using the methods recommended by the manufacturer for
achieving the best result for the substrate under the project conditions.
PART 3 3INSTALLATION
A.
Install platform lifts in accordance with in compliance with regulatory requirements
specified and the manufacturer's instructions.
B.
Install system components and connect to building utilities.
C.
Accommodate equipment in space indicated.
D.
Startup equipment in accordance with manufacturer's instructions.
E.
Adjust for smooth operation.
PART 3 4FIELD QUALITY CONTROL
A.
Perform tests in compliance with regulatory requirements specified and as required
by authorities having jurisdiction.
B.
Schedule tests with agencies and Architect, Owner, and Contractor present.
PART 3 5PROTECTION
A.
Protect installed products until completion of project.
B.
Touch-up, repair or replace damaged products before Substantial Completion.
X3 Specification 23265-A-DS Section 14 42 13
END OF SECTION