Garden PAC InverTech GHD-150-022 Manual de instalação e do utilizador - Página 13

Procurar online ou descarregar pdf Manual de instalação e do utilizador para Bomba de calor Garden PAC InverTech GHD-150-022. Garden PAC InverTech GHD-150-022 20 páginas.

Garden PAC InverTech GHD-150-022 Manual de instalação e do utilizador
1. Wiring diagram
A. For power supply: 230V 50Hz
Distribution Box(Customer prepare)
Power Supply
230V 50Hz
Earthing
B. For power supply: 400V 50Hz
Distribution Box(Customer prepare)
Power Supply
400V 50Hz
Earthing
Note: For your safe use in winter, it's strongly recommended to equip heating priority
function. For the detailed wiring diagram, please refer to Appendix 1.
2.Options for protecting devices and cable specification
MODEL
Rated Current
A
Rated
Breaker
Residual
Action Current
mA
Fuse
A
2
Power Cord(mm
2
Signal cable(mm
NOTE: The above data is adapted to power cord ≤ 10m. If power cord is
increased. The signal cable can be extended to 50m at most.
Fuse
Breaker
Fuse
Breaker
GHD-15
GHD-15
GHD-15
0-0219
0-0220
0-0221
10.5
11.0
12.0
30
30
10.5
11.0
12.0
3×1.5
3×2.5
3×2.5
3×0.5
3×0.5
3×0.5
Swimming Pool Heat Pump Wiring Board
Power Cord
Swimming Pool Heat Pump Wiring Board
Power Cord
GHD-15
GHD-15
0-0222
0-0223
13.0
16.0
30
30
30
13.0
16.0
3×2.5
3×2.5
3×0.5
3×0.5
- 11 -
For installers and professionals
GHD-15
GHD-15
0-0224
0-0225
21.0
25.0
30
30
21.0
25.0
3×4
3×6
3×0.5
3×0.5
10m, wire diameter must be
GHD-15
GHD-15
0-0226
0-0227
9.0
12.0
30
30
9.0
12.0
5×2.5
5×2.5
3×0.5
3×0.5