Fujitsu SPARC Enterprise M9000 Notas de produto - Página 22

Procurar online ou descarregar pdf Notas de produto para Servidor Fujitsu SPARC Enterprise M9000. Fujitsu SPARC Enterprise M9000 44 páginas. For xcp version 1041
Também para Fujitsu SPARC Enterprise M9000: Manual de iniciação (4 páginas), Características Manual (30 páginas), Manual suplementar (36 páginas)

Fujitsu SPARC Enterprise M9000 Notas de produto
Errata of the SPARC Enterprise M8000/M9000
Servers Service Manual
TABLE 3

Errata of the SPARC Enterprise M8000/M9000 Servers Service Manual

TABLE 3
Page
Number
Description
2-13
2.2, "Operator Panel"
The operating state of the server is checked by
observing the LEDs, and the power supply is
operated with the switch.
5-3
TABLE 5-1 Relationship Between Doors and
Components That Can Be Accessed
IDPFC
Chapter
"Cold Replacement"
6-24
Shutdown processing is executed for all the
domains, and the power is turned off.
Chapter
"Cold Replacement"
6-23
Confirm that shutdown processing is completed
by confirming that the Power LED (green) on
the operator panel is off.
8-9
8.2, "Hot Replacement" Step 2 c.
Check the states of LEDs (Check LED: blinking)
on the FAN Unit to be replaced, and begin the
actual replacement work when a message
instructing the user to replace the target FAN
Unit is displayed.
12-3
12.2, "Active Replacement" Step 3
Blink the FAIL LED of the target HDD.
12-5
12.3, "Cold Replacement" Step 4
Confirm that shutdown processing is completed
by confirming that the Power LED (green) on
the HDD is off.
20-12
20.2.1, "SPARC Enterprise M8000/M9000 Servers
BPs" P.20-12 Caution
For tightening the power bar, use a torque of
8.24 N.m (84 kgf.cm) for M8 bolts and 3.73 N.m
(38 kgf.cm) for M6 bolts.
12
SPARC Enterprise M8000/M9000 Servers Product Notes for XCP Version 1041 • October 2007
lists the errata of the SPARC Enterprise M8000/M9000 Servers Service Manual.
Update
The operating state of the server is checked by
observing the LEDs, and the power supply is
operated with the POWER switch.
RDPF
The OS shutdown processing is executed for all
the domains, and then the power-off processing
is executed.
Confirm that the power-off processing is
completed by confirming that the Power LED
(green) on the operator panel is off.
Check the states of LEDs (Power LED: off,
Check LED: blinking) on the FAN Unit to be
replaced, and begin the actual replacement
work when a message instructing the user to
replace the target FAN Unit is displayed.
Blink the CHECK LED of the target HDD.
Confirm that shutdown processing is completed
by confirming that the READY LED (green) on
the HDD is off.
For tightening the power bar, choose a torque
depending on the bolt size.
• For M8 bolts, use a torque of 8.24 N.m
(84 kgf.cm).
• For M6 bolts, use a torque of 3.73 N.m
(38 kgf.cm).