Kohler VEIL HT100 PNE IWT Manual de instruções de instalação - Página 6
Procurar online ou descarregar pdf Manual de instruções de instalação para Produto de canalização Kohler VEIL HT100 PNE IWT. Kohler VEIL HT100 PNE IWT 30 páginas. Wall-hung toilet
Adjust to horizontal and finish tightening. See Fig. 5c.
Apply sealant to make sure the bowl's edge seals to the wall.
See Fig. 5d.
Install the toilet seat according to the toilet seat installation
instructions.
5. INSTALL THE SIDE PANELS
NOTE:
The left panel (L) and right panel (R) are not
interchangeable and they shall be respectively fixed onto the
left side and right side of the bowl as shown in Fig.6.
!
Align the iron sheet on one side panel with the magnet
on the bowl. Fix the side panel onto the bowl and adjust it
with hand to the desired position.
!
Repeat for the second side panel.
1247360-T01-G
Fig. #5c
5c
Magnet
5.
!
!
Iron Sheet
Fig. #6
6
-6-
5c
5d
Fig. #5d
5d
L
6
R