Kohler BEAM K-23056TW Instruções de instalação - Página 2

Procurar online ou descarregar pdf Instruções de instalação para Luminárias de casa de banho Kohler BEAM K-23056TW. Kohler BEAM K-23056TW 4 páginas. Sensor faceplate

Kohler BEAM K-23056TW Instruções de instalação
ROUGHING-IN
Reference Value
PACKAGING LIST
PACKAGING LIST
S/No. Material No.
1
1306552-*
1297096
2
3
1331845-T01
4
1331845-T8
1059169/
5
1284513/
1284514
6
1331137
1331114 or
7
1331117
8
1331139
A: Transformer Installation
Before the in wall tank is installed, the transformer is installed
on the wall first. (It is recommended to place transformers on
the ceiling or other hidden and easy to operate places.) As
illustrated, the output connector of transformer (with 2 core
female connector) through the bushing pipe (the bushing pipe
dia.
16~ 20 is recommended) into water tank. Connect
the input terminal of transformer(black) with power supply
220V/110V AC. Customer can use the PVC pipe for wiring.
See figure
Warning:
Don't mistake the input and output terminal,
or it may cause damage to the product. Insulation
measures must be taken at the connection. Otherwise,
short-circuit current may occur and damage the
transformer.
Low-voltage AC
Transformer Output
Connector (In Tank)
(
)
1331845-T01-B
225 1.5
Kohler reserves the right to change marked dimensions without prior notice.
Material Description
English
Beam Sensor Faceplate
Positioning Plate
Installation Instruction
Service Parts Page
Fixed Tube/
Fixation Plate/
Screw
Pump Control Module Assy
Transformer Assy
220v or 110v
Carton Individual
Ceiling
M8 3 core female connector cable to conncet air pump
M8
M8 2 core male connector cable to connect power
M8
Material Description
Chinese
/
/
220V
110V
A
16~ 20mm)
Bushing Pipe
-2-
( 2
)
AC220V/110V
Input AC 220V/110V (Black)
AC220V/110V ( )
Output AC 6V
AC6V
Transformer Assy.
UNIT : mm
Unit
1pcs
1pcs
1pcs
1pcs
4pcs/
4pcs/
4pcs
1pcs
1pcs
1set