Kohler BELAY K-156T-LCP Manual de instruções de instalação - Página 12
Procurar online ou descarregar pdf Manual de instruções de instalação para Luminárias de casa de banho Kohler BELAY K-156T-LCP. Kohler BELAY K-156T-LCP 23 páginas.
TEST OPERATION
Test Run the Bath
NOTICE: When testing the heated surface functions,
allow 5 to 10 minutes to begin feeling heat on the end
wall.
·
Operate the heated surface user keypad to test the
temperature settings.
·
Fill the bath at least 2" (51 mm) above the top of the
highest whirlpool jet.
·
Operate the bath for 5 minutes and check all piping
connections for leaks. Check for leakage along the
front, sides, and back of the bath.
·
Turn on each of the bath features, and verify proper
function.
·
Turn off the features, then completely drain the
water from the bath.
Heated Surface Control
Air System
1397340-T01-A
Whirlpool System
-12-
·
·
·
5
·
·
5-10
2" 51 mm