Kohler K-10553 Manual de instalação - Página 5
Procurar online ou descarregar pdf Manual de instalação para Luminárias de casa de banho Kohler K-10553. Kohler K-10553 36 páginas. Accessories
Também para Kohler K-10553: Manual de instalação e cuidados (16 páginas)
4. Anchor Installation
NOTE: You may need to disassemble some of the accessories. Some
accessories will be packed with the wall plate installed in the post.
Loosen the setscrew and remove the wall plate if needed.
Press and hold the legs of a wall anchor (provided) together and
insert the wall anchor legs into the hole. Insert all wall anchors
into the pre-drilled mounting holes.
With a hammer, carefully tap each wall anchor until they are
flush with the finished surface.
If the wall anchor was inserted into a space between the studs, it
will be necessary to spread the wall anchor legs.
Repeat for all wall anchors inserted between studs.
Ensure that the wall anchors are flush with the finished surface.
5. Wall Plate Installation
Orient the wall plate with the large slotted mounting hole up and
the smaller hole under the higher anchor.
Secure the wall plate with the supplied panhead screws.
Repeat at each wall plate location.
Kohler Co.
5
1023327-2-B