Kohler EVOK K-18347T Instruções de instalação - Página 2

Procurar online ou descarregar pdf Instruções de instalação para Banheiras Kohler EVOK K-18347T. Kohler EVOK K-18347T 5 páginas. Freestanding acrylic bath

Kohler EVOK K-18347T Instruções de instalação
NOTE: Damage occurred during transport or
installation shall not be covered by warranty.
D. New or Replacement Installation
Requirements
This bath can be installed in new or existing bathrooms.
For replacement: Remove the old bath, and remove
enough old wall material and floor covering from the
area to allow for installation. Remove any old plumbing
that does not confo m to the rough-in requirements.
r
For new installation: Position the plumbing according to
the rough-in dimensions. Cap the suppliers, and check
for leaks.

INSTALLATION REQUIREMENTS

A. Tools Required
·
Adjustable pipe
wrench
·
Rule
·
Level
·
Safety shoes
·
Safety glasses
·
Square
·
Screwdriver
·
Pliers
·
Utility knife
·
Adjustable wrench
C. Installation Note:
Read the entire installation instructions included with
fixture before beginning the installation.
If installing a rim-mounted faucet, make sure there is no
interference with drain overflow before drilling any
holes.
D. Clearance Requirements
Check the roughing-in and room dimensions to provide
adequate available space for the bath unit.

SITE REQUIREMENTS

A.
Subfloor
Preparation
Check the flooring under the bath, and make repairs as
needed. Make sure the
recommended to prepare waterproof layer for the
subfloor beforehand.
1119528-T01-C
B. Materials Required
·
Plumbers putty
·
Wall coverings(as necessary)
·
Silicone sealant
·
Gypsum cement(optional)
·
Construction adhesive
(optional)
·
Protective covering for
bathtub
·
Nails
subfloor
is level. It is strongly
D.
A.
·
·
·
·
·
·
·
·
·
·
C.
:
D.
A.
-2-
B.
·
·
(
)
·
·
(
)
·
(
)
·
·