Kohler K-1112P Manual de instalação - Página 11

Procurar online ou descarregar pdf Manual de instalação para Banheiras Kohler K-1112P. Kohler K-1112P 48 páginas. Bath with airjets and integral apron canada
Também para Kohler K-1112P: Manual de instalação (48 páginas)

Kohler K-1112P Manual de instalação
Purge Mode
Increases Flow
On/Off
Decreases Flow

8. Test Run the Bath with Airjets

For information on unit operation, refer to the "Confirm Proper Operation" section.
Check all electrical connections, and make sure the electrical power to the bath with airjets is on.
Make sure all piping connections in the air harness are secure.
Verify that the blower motor is secure.
Temporarily remove the plastic drop cloth or other protective sheeting from the bath.
Fill the bath to a level at least 2" (5.1 cm) above the top of the highest airjet.
Check the drain piping for leaks. Repair any leaks.
Operate the bath and check for air flow through the airjets. Check the air piping for air leaks.
Stop the bath and drain the water.
Return the plastic drop cloth or other protective sheeting to the bath.
Kohler Co.
11
1040293-2-E