Kohler K-1112P Manual de instalação - Página 7

Procurar online ou descarregar pdf Manual de instalação para Banheiras Kohler K-1112P. Kohler K-1112P 48 páginas. Bath with airjets and integral apron canada
Também para Kohler K-1112P: Manual de instalação (48 páginas)

Kohler K-1112P Manual de instalação
1/16"
(2 mm)
Tile
Approved Tile Backing

2. Prepare the Site - Concrete Construction

NOTICE: Do not support the bath by the rim.
NOTICE: Refer to the Roughing-in Guide packed with this product for proper minimum lbs/square foot
(kg/square meter) floor support loading.
NOTICE: Provide adequate ventilation and a minimum of 15 cubic feet (.4 cubic meters) in the installed
location for cooling the motor and to supply sufficient air for the blower. Do not install the blower motor
closer than 1" (2.5 cm) from the wall or other objects.
Make sure the flooring offers adequate support for your bath, and verify that the subfloor is flat and
level.
Construct brick or concrete supports.
Provide a 1/16" (2 mm) gap between the bath rim and the concrete or brick framing. Frame the
floor, or construct a frame for a raised installation, in accordance with the roughing-in information
packed with the bath.
Position the plumbing according to the roughing-in information packed. Cap the supplies, and
check for leaks.

3. Prepare the Bath with Airjets

Install the drain to the bath according to the drain manufacturer's instructions. Do not connect the
trap at this time.
Position a clean drop cloth or similar material in the bottom of the bath to protect the finish. Be
careful not to scratch the surface of the bath.
Kohler Co.
Bath
Brick
Tile
Approved Tile Backing
Brick
7
Apron Side
1040293-2-E