Kohler ADAIR K-5171T-C-0 Manual de instruções de instalação - Página 5
Procurar online ou descarregar pdf Manual de instruções de instalação para Casas de banho Kohler ADAIR K-5171T-C-0. Kohler ADAIR K-5171T-C-0 9 páginas. 4.2l skirted class five+ one-piece toilet, s-trap 305/400mm
Carefully align and lower the bowl.
Apply weight to the bowl rim to let the
outlet insert into plastic trap.
Carefully thread the screws into the
brackets, until toilet is secure.
Alternately tighten left and right sides
to prevent pulling the toilet off center.
Install cap to cover screw.
Do not overtighten.
Apply caulk around base.
TO CONNECT WATER
SUPPLY
* Flexible hose (not provided) are
recommended to connect the supply
line to the fill valve. If you use a rigid
connection(not provided), take care
not to apply side forces to the bottom
of the fill valve. Be sure the rigid
connection must be fit with supply line
completely to prevent damage shank
by forced connection.
IMPORTANT:
Before turning on the supply valve for the first
time, follow the steps below to clear sand, debris and rust
from the system:
Make sure water sure water supply is off. Remove valve END
by rotating it 1/8 turn counterclockwise.
While holding a container over the uncapped VALVE to
prevent splashing, turn water supply on and off a few times.
Leave water supply off.
Replace END by engaging lugs and rotating 1/8 turn
clockwise.
Make certain the top is turned to the locked
position. Valve may not turn on if top is not fully in the
locked position.
Turn on water supply. Check that water level is at the marked
water line.
1259054-T01-A
Outlet
Plastic Trap
Bushing
Screw
Cap
Fig.#11
11
Supply Shank*
Fig.#12
12
-5-
Fig.#9
9
Fig.#10
10
Supply Shut-Off Valve
(
(
)
)
1/8
1/8