Kohler ESCALE K-23136T-CPS Manual de instruções de instalação - Página 39

Procurar online ou descarregar pdf Manual de instruções de instalação para Casas de banho Kohler ESCALE K-23136T-CPS. Kohler ESCALE K-23136T-CPS 45 páginas.

Kohler ESCALE K-23136T-CPS Manual de instruções de instalação
B. Align tank on the wall as shown and locate the installation
holes of the Z-connecting plate. Mark on the wall for the
appropriate position for the Z-connecting plate, and drill
four holes with a diameter of 12mm and a depth of 65mm
with churn drilling as shown in illustration, and fill in the
holes with expanding bolt caps.
B. 水箱靠在墙上,在墙壁上把 Z 连接板安装孔做记号后,用
冲击钻钻四个 12mm 深 65mm 的小孔,然后安装膨胀螺
丝套。
C. As shown, tighten the screw and washer to fixate the
tank.
C. 如图用 4 颗螺丝及垫片将水箱固定。
Note: 1. Ensure that the tank remains level and plumb.
2. Keep the outlet pipe of the water tank upright. Do
not bend it.
注: 1. 水箱保持水平和竖直方向的平衡。
2. 保持水箱冲水管的竖直,不要折弯。
3B� Following the steps: 1C� Connecting the
water pipe
3B. 按照步骤:1C. 供水管连接
3C� Following the steps: 1D� Installation of
reserved access panel
3C. 按照步骤:1D. 预留检修口安装
1456149-K2-A
Outlet Pipe
冲水管
Expanding Bolt Cap
膨胀螺丝套
-32-
Spirit Level
水平尺
Tank
水箱
Z-Connecting
Plate
Z 连接板
Washer
垫片
Screw
螺丝