TOOLS AND MATERIALS REQUIRED
(Not supplied)
·
254mm (10") adjustable wrench
·
305mm (12") pipe wrench
·
Metal file (file cut)
·
Tape measure
·
Tubing cutter
·
Level
·
Hacksaw
·
Putty knife
·
Screwdriver
·
Sponge
·
Safety Glasses
·
Toilet gasket (wax seal)
·
Toilet installation flange
·
Toilet T-bolts (2), 8mm (5/16") diameter
·
Toilet supply shut-off valve, 10mm (3/8") recommended
NOTICE:
If the existing toilet does not have a supply shut-off
valve below the tank, install one before installing the new
toilet.
* Flexible hose are recommended to connect the supply line
to the fill valve. If you use a rigid connection, take care not to
apply side forces to the bottom of the fill valve.
Unit: mm
727
38 SPUD
330
67
MIN.
143
279 MIN.
702 752
57
MIN.
51
38 SPUD
162
143
254 305
INSTALLATION
TO REMOVE EXISTING TOILET
Turn off the water supply. Flush the toilet, and use a sponge
to remove the remaining water from the tank and bowl.
Disconnect the supply shut-off valve (if present), and remove
the old tank and bowl.
1007282-2-A
MIN.
368
375
241
375
C
OF OUTLET
L
K-4349T
368
375
375
241
C
OF OUTLET
L
K-4350T
·
254mm
·
305mm
·
·
·
·
·
·
·
·
·
·
(
)
·
·
8mm T
·
*
38 SPUD
400
67
MIN.
279 MIN.
57
MIN.
70
171
143
254 305
Fig.#1
1
(
-2-
(2 )
10mm
368
MIN.
727
445
C L
OF OUTLET
K-4367T
702 752
38 SPUD
368
445
375
241
C L
OF OUTLET
K-4368T
)