Kohler WELLWORTH K-5778T-S Manual de instruções de instalação - Página 4
Procurar online ou descarregar pdf Manual de instruções de instalação para Casas de banho Kohler WELLWORTH K-5778T-S. Kohler WELLWORTH K-5778T-S 10 páginas. 4.2l skirted two-piece toilet
INSTALLATION
TO REMOVE EXISTING TOILET
Turn off the water supply. Flush the toilet, and use a sponge
to remove the remaining water from the tank and bowl.
Disconnect the supply shut-off valve (if present), and remove
the old tank and bowl.
Remove the old gasket from the floor
and the closet flange with a putty knife.
Remove the old T-bolts and discard
them.
NOTICE:
if the new toilet is not
installed immediately, temporarily stuff
a rag into the closet flange.
NOTICE: Do not use white cement or high lime content
cements to install this toilet. The expansion of cement due to
a rise in temperature may make the toilet crack or cause
damage. Kohler is not responsible for any damage caused by
installation with the use of cement.
TO INSTALL SUPPLY
SHUT-OFF VALVE
Install the supply shut-off valve so it is
67mm (2-5/8") above the finished floor
line, and 194mm (7-5/8") to the left of
the closet flange centerline.
The centerline of the supply shut-off
valve outlet should extend 67mm
(2-5/8") from the finished wall. Install
the supply shut-off valve with the outlet
vertical.
TO INSTALL NEW TANK
Make sure the three tank bolts extend
fully through the holes in the gasket.
Set the tank onto the bowl using the
bolts as a guide. Center the gasket on
the inlet of the bowl. Assemble the
washers and brass nuts onto the bolts.
Alternately tighten the three brass nuts
so that the top of the tank is level with
the top of the bowl and a watertight
seal is obtained.
CAUTION: Risk of personal
injury or product damage.
Overtightening may cause
breakage or chipping.
1232940-T01-A
Closet Flange
Fig.#2
2
Supply Shut-Off Valve
194
67
Closet Flange
Centerline
305
Fig.#3
3
Tank Bolt
*Gasket*
*
*
Washer
Brass Nut
Fig.#4
4
-4-
(
)
mm
T
67
194
mm
67mm;