Kohler WELLWORTH LITE K-3421-PB Manual de instruções de instalação - Página 3

Procurar online ou descarregar pdf Manual de instruções de instalação para Casas de banho Kohler WELLWORTH LITE K-3421-PB. Kohler WELLWORTH LITE K-3421-PB 8 páginas. Vitreous china reverse trap toilets

Kohler WELLWORTH LITE K-3421-PB Manual de instruções de instalação

INSTALLATION

TO REMOVE EXISTING TOILET
Turn off water supply. Flush the toilet and sponge out re-
maining water from tank and bowl. Disconnect supply
valve and remove old tank and bowl.
Remove old gasket from the floor and closet flange with
a putty knife. Remove old T-bolts and discard.
NOTICE: If a new toilet is not installed immediately,
temporarily stuff a rag in the closet flange.
Install new 5/16" diameter T-bolts.
TO INSTALL NEW SUPPLY SHUT-OFF
VALVE
Install toilet supply shut-off valve so it is 9" above floorline
and 4-1/8" to the left of the centerline of the closet flange.
Centerline of supply shut-off outlet should extend 4" from
finished wall. Install the supply shut-off valve with outlet
vertical.
Kohler Co., Kohler, WI
T-Bolts
9"
12"
3
Closet Flange
Fig. #2
Closet Flange
Fig. #3
Supply Shut-Off
Valve
4-1/8"
Fig. #4
CA
112375-2-
(B)