Kohler VEIL K-21800T-X Manual de instruções de instalação - Página 4
Procurar online ou descarregar pdf Manual de instruções de instalação para Mobiliário de interior Kohler VEIL K-21800T-X. Kohler VEIL K-21800T-X 8 páginas. Bathroom furniture
![Kohler VEIL K-21800T-X Manual de instruções de instalação](/uploads/products/server2/2659427/2659427.jpg)
2. Install stand.
a. Fix the four feet to the stand with the attached screws and a socket head
wrench as shown in the figure below.
b. Lay the VEIL cabinet on its back. Fix the stand onto the bottom plate with
tapping screws as shown in the figure below.
3. Install counter top and washbasin.
a. Install the counter top: As shown in the figure below, apply silica gel onto the
area on the cabinet panel indicated by the dotted lines to fix the counter top
(the back of the counter top shall be aligned with that of the cabinet, while the
left and the right sides of the counter top shall be both 1.5 mm away from the
cabinet). Find the connectors A1 and B1 on the stone counter top and the
connector B2 on the cabinet according to the figure below.
1356428-T01-A
2. 安装脚架。
a. 如下图将四只支脚用配套的螺杆和内六角扳手固定在脚架上。
Fig. 4 图 4
b. 将维亚浴柜放倒背部着地,将脚架按下图所示用自攻螺丝固定在底板上。
Fig. 5 图 5
3. 安装台面、台盆。
a. 安装台面:如下图所示,在浴柜面板处虚线位置打硅胶,用于固定住台面(注
意台面的后部与浴柜的后部齐平,台面左右两边各凸出浴柜约 1.5mm) 。并按
下图所示找到对应的电路接口,其中石材台面上有 A1 和 B1 接口,浴柜上有
B2 接口。
Area With Silica Gel
虚线区域为打硅胶区域
A1
Enlarged Figure Of The Connector
On The Counter Top
台面电线接口放大图
B2
Enlarged Figure Of The Connector
On The Cabinet
柜体电线接口放大图
Fig. 6 图 6
- 4 -
Area For Leg Frame
安装脚架区域
B1
B2
A1