Aqua Cooler AC-PV8EBFY-ASM Manual de utilização e cuidados - Página 6
Procurar online ou descarregar pdf Manual de utilização e cuidados para Fonte exterior Aqua Cooler AC-PV8EBFY-ASM. Aqua Cooler AC-PV8EBFY-ASM 11 páginas.
INSTALLATION CONT.
Before the Bottle Filler cabinet is set into place, feed the terminals on the power supply power
cord and the long green ground wire through the bushing on the cooler top.
Connect male terminals on the bottle filler power supply to female terminals on power cord.
Make sure that the power cord is firmly connected to the power supply.
Attach the long green ground wire to cooler power cord ground located on cooler frame or to
electrical box ground.
Make sure the cabinet fits into the groove in the rubber gasket on both sides and front of the
wrapper.
Attach Bottle Filler assembly to the frame using two (2) torx screws. If you are going to change
the electronics default settings, remove the Top Cap and two (2) torx screws.
Plug bottle filler cord into the electrical outlet. The program should be set up specific for that
installation. See the program guide on next page. Access programming Pushbutton through top
of Bottle Filler.
Turn ON water supply and check for leaks. Place a container in the alcove to release any trapped
air from the system. Plug in the power cord and replace the front panel.
If everything works correctly, place the Top Cap back on the Bottle Filler and the two (2) torx
screws to fasten it in place. Otherwise, calibrate the sensor per the instructions on the next
page.
Your Partner in Cool.
10
SET-UP GUIDES
END CONNECTION:
The unit must be installed with the backflow prevention device complying with AS/NZS2845.1.
The inlet end connection is DN15 BSP Male. Please refer to drawing below for instruction.
DRAIN CONNECTION:
Drain fitting must comply with AS1589 and AS2887. Aqua Cooler recommends this installation
is performed by qualified personnel only. The parts for drain connection includes DN32 tee
poly barb, 32mm marine flex hose, 30-45 stainless steel hose clamp and DN32xDN40 rubber
coupling.
The drain connection is DN40 metal banded metal flexible couplings. Please refer to steps below
for instruction.
NOTE: PV8EBFY only have one water fountain so please modify the drain connections
accordingly. (Hose 3 is not needed)
1. Inspect image of installation assembly and cut hose to the following lengths: Hose 1: 700mm,
Hose 2: 800mm, Hose 3: 400mm and Hose 4: 100mm
2. Prepare hot water (>80°C) and put the hose ends into the hot water for >30 seconds until soft
before inserting them on the hose barbs to a depth of 30mm
3. Once the hose has been put onto the hose barb and the drainage pipes on the drinking
fountains, tighten the hose clamps.
4. Connect the Rubber Coupling to the final hose barb tee outlet and check for leaks by
plugging the DN40 outlet of the Rubber Coupling.
11