Aqua Creek Products F-03EZPLNA Manual de instalação, montagem e funcionamento - Página 8

Procurar online ou descarregar pdf Manual de instalação, montagem e funcionamento para Sistemas de elevação Aqua Creek Products F-03EZPLNA. Aqua Creek Products F-03EZPLNA 12 páginas. Ez pool lift

Aqua Creek Products F-03EZPLNA Manual de instalação, montagem e funcionamento
STEP 5:
Locate the chain assembly and insert each "S"
hook into the holes in the sling support bars (A).
Attach the hanger to the boom eye on the lift (B).
Attach the chain links to the hanger (C) so that
the sling is at the appropriate height to allow the
user easy access and so that the sling will clear
your pool wall (if applicable).
Assembly is complete. Prior to lifting any
persons in the lift, it is highly recommended that
the lift is operated at least once without a load to
check for proper functioning and that the
instructions for operating the lift be read and incorporated into a training program for the
persons who will be operating the lift.
EZINST-1/7/16
© Aqua Creek Products LLC 2003-2016
B
C
A
Page 8 of 12