Aqua Creek Products Power EZ F-03PEZ Manual - Página 4

Procurar online ou descarregar pdf Manual para Sistemas de elevação Aqua Creek Products Power EZ F-03PEZ. Aqua Creek Products Power EZ F-03PEZ 13 páginas. Pool lift

Aqua Creek Products Power EZ F-03PEZ Manual
7.
Carefully insert the anchor into the hole. Pour a small amount of 2 part epoxy, or equivalent, around
the anchor. Check that the anchor will sit level or fl ush with the fi nished deck surface.
NOTE: Fill the hole about 1/3 full of 2 part epoxy, or equivalent, prior to inserting the anchor. As
you insert the anchor, rotate it back and forth so that you can evenly distribute the cement
or epoxy around the anchor.
8.
Once anchor is level and fl ush with deck, pour cement or epoxy into the remaining space around
the anchor making sure there are no void spaces. Let cement or epoxy cure for 24 hours (or minimum
manufacturer's recommendations) before installing and using lift.
42"
TO
48"
4
Copyright © 2016 Aqua Creek Products All Rights Reserved
Anchor Installation: Retro-Fit
[30.5 cm] 12" MIN
[91 cm] 36" MAX
[15 cm]
6" MIN
ANCHOR SOCKET
C L
CEMEMNT/EPOXY
GROUNDING LUG
TOP OF SLAB
[20.3cm]
8" MIN.
FIGURE 1
Revised 2/24/16