Dextra HBE3 M3 LE3 Folheto de instalação
Procurar online ou descarregar pdf Folheto de instalação para Equipamento de iluminação Dextra HBE3 M3 LE3. Dextra HBE3 M3 LE3 4 páginas.
HBE3 M3 LE3/LS3 Installation Leaflet
Voltage: 220-240V / 50-60Hz
LED Power: 1.8W
Battery: Li-FeP04 18650 3.2V 1500mAh
Operating Temperature: 0°C - 40°C
IP20
BEFORE installation, the electrical supply and battery pack MUST be disconnected.
1.
Ceiling/Wall surface mount
Drill a hole in the ceiling and feed the cable through.
3.
Drill two fixing holes and secure the cover in place
with two screws.
5.
Connect the battery.
DIL-0300-0068
WARNING - THIS LUMINAIRE MUST BE EARTHED
This luminaire has been tested and is manufactured to comply with BS EN
60598 : specification for general requirements and tests. It should be installed by
a suitably qualified person in accordance with IEE.
CAUTION: there is a potential risk of electric shock from the LED boards when
the product is operational with the cover removed.
NOTE: INSTALLATION AND OPERATION OF THE LUMINAIRE BEYOND ITS
SCOPE OF SUPPLY WILL INVALIDATE THE WARRANTY.
2.
Remove the top cover and drill the cable entry hole in
4.
Pass the cable through and wire directly into the
terminal block. Secure the mains cable using the
6.
Attach the fitting to the top cover and secure in place.
When wall mounting, rotate the body 90 degrees and
Revision - B
the indicated location.
internal cable clamp.
secure in place.
25/04/2022