Aqua Logic DSHP-9-WCMD Manual de instalação e manutenção - Página 4
Procurar online ou descarregar pdf Manual de instalação e manutenção para Bomba de calor Aqua Logic DSHP-9-WCMD. Aqua Logic DSHP-9-WCMD 9 páginas.
WARNING: DO NOT over tighten water fittings.
•
Mount Heat Pump on a flat pad and away for water spray.
•
Give at least 1 ft all the way around unit for servicing.
•
Install evaporator water inlet and outlet.
•
Install condenser water inlet and outlet.
•
Test water fittings for leaks.
•
Apply electrical power to the Heat Pump.
•
Adjust the controller to the desired water temperature. (See "Operation and Programming")
•
Important:
Regulate condenser water until pressure on the pressure gauge reads between 115 to 125 PSIG for models
DSHP-4-WCMD thru DSHP-9-WCMD and 195 to 220 PSIG for model DSHP-10-WCMD. Check after 15 minutes of run
time, adjust the water flow (if needed) to the correct pressure.
Warning: This unit must have proper water flow rate both on the evaporator and
the condenser to operate correctly.
HEAT PUMP SET-UP AJUSTMENTS
Copyright© 2016 Aqua Logic, Inc. Effective date of 1/2016
4