Aqua Logic ALCUV-1 Manual de instruções de instalação e funcionamento - Página 4

Procurar online ou descarregar pdf Manual de instruções de instalação e funcionamento para Equipamento de laboratório Aqua Logic ALCUV-1. Aqua Logic ALCUV-1 9 páginas. Compact uv

ASSEMBLING YOUR ALCUV EQUIPMENT:
• Upon receipt of your UV sterilizer, inspect the packaging for obvious damage.
Be sure to note any damage on the shipper's manifest in case you need to file a
claim.
• Open the package and inspect for concealed damage (for example, broken
lamps or sleeves, etc.). Claims for damage must be filed with the carrier
promptly.
• Place the unit where you want to install it.
• If you wish to install the unit on a wall, you must put it on a sturdy shelf. Do NOT
attempt to screw or bolt the unit directly to the wall.
• To protect the quartz sleeves and lamps from damage during shipment, the
lamps have been individually wrapped. You will need to do the following:
• Unwrap the lamp(s). We recommend using a dry lint-free cloth to handle the
lamps to avoid getting oils from your skin on the lamps.
• Follow the "Replace Bulb" procedures on page 5 to install the lamps.
• Place the unit where you want to install it. Make sure to install the unit in an
upright position.
• Allow at least 20" of clearance above the unit so that lamps and/or quartz sleeves
can be replaced without having to disconnect the unit from your system.
• We recommend using unions and valves (not included) on the inlet and outlet of
the unit so that the unit may be removed from your system if necessary.
• Be sure to allow the power cord to loop below the UV and the power outlet so
that water cannot drip down the power cord into either the UV or the power
outlet.
• Connect unit to your system.
• Apply power to pump and check system carefully for leaks.
• Plug UV sterilizer into outlet and check for proper operation of all UV lamps.

SCHEDULED MAINTENANCE:

1 Month Scheduled Maintenance (all models):
• Look through the viewport in lid of unit to see if the bulb is glowing.
• Carefully inspect the UV and plumbing for leaks.
1 Year Scheduled Maintenance:
• Replace bulb [see page 5].
Maintenance as Required:
• Replace quartz sleeve assembly [see page 5].
• Replace ballast as needed [see page 6].
• Remove organics from quartz sleeve assembly [see page 7].
©2004 Aqua Logic,® Inc. 8268 Clairemont Mesa Blvd. Suite 302 San Diego, CA. 92111
Ph (858) 292- 4773 FAX (858) 279-0537 email: [email protected] website: www.aqualogicinc.com
Page 4