ABACUS Aquanova Scorpio 1800 Pacote de informações - Página 6

Procurar online ou descarregar pdf Pacote de informações para Ajuda na casa de banho ABACUS Aquanova Scorpio 1800. ABACUS Aquanova Scorpio 1800 18 páginas. Fixed seat & transfer system operation

Pre - Installation Requirements
ELECTRICS
1.
5 Amp IP65 rated switched fused spur unit, with 2m of 1.5mm 3 core round
ex trailing. Located at the tap end of the bath, positioning and speci cation to be in
accordance with IEE regulations.
The Spur box should be mounted between 300-500mm o the oor.
2.
Where a whirlpool is tted a 13 Amp IP65 rated switched fused spur is
required in addition.
Electrical Connection & Earth Bonding
A 30mA RCCD or RCBO is required in compliance in accordance with 17th Edition IEE
regulations. This should be located just outside the bathroom or on the consumer unit
covering that area of the building.
Earth Bonding and Cross Bonding are to be tted and tested for continuity in
accordance with IEE regulations.
Flexible in conduit for protection.
Image for Plumbing and Electrical Supplies
(Reference purpose only) - Side and End wall feeds
6