Aqua PRO ECO500 Manual de início rápido - Página 8
Procurar online ou descarregar pdf Manual de início rápido para Aquecedor de piscinas Aqua PRO ECO500. Aqua PRO ECO500 12 páginas. 50,000 btu heat & cool heat pump pool and spa heater
Pool Heat Pump Customer Remote Control System illustration.
a. The 5 & 6 terminal are the connectors with switch of customer remote control system.
If not operate this remote control system, pls connect terminal 5 & 6 with a wire.
b. If switch on 5 & 6 terminal (run customer remote control system), heat pump will operate
as instruction on LED of heat pump. LED indicator light up as current heat pump operation
status.
If switch off 5 & 6 terminal (not run customer remote control system), heat pump will stop.
All indicators light out.
Run customer remote control system, switch on terminal 5 & 6, heat pump will operate as
heat pump LED instruction, switch off terminal 5 & 6, heat pump will stop operation
2. Installation instruction and requirement
The swimming pool heater must be installed by a professional. The users are not qualified to
install by themselves, otherwise damage may happen to the heater or threat the body safety of the
user.
A Installation
1-The swimming pool heater should be installed in a place with good ventilation;
2-The frame must be fixed by bolts to concrete foundation or brackets. The concrete foundation
must be solid and fastened; the bracket must be strong enough antirust treated.
3-Please don't stack substances that will block air flow near inlet or outlet area, and there is no
barrier within 50cm behind the main machine, or the efficiency of the heater will be reduced or even
stopped.
4-When the machine is running, there will be condensation water discharged from the bottom,
please pay attention to it. Please hold the drainage nozzle (accessory) into the hole and clip it well,
and then connect a pipe to drain the condensation water out.
B Wiring
1-Connect to appropriate power supply; the voltage should comply with the rated voltage of the
products. Earth the machine well.
2-Wiring must be handled by a professional technician according to the circuit diagram.
3-Set leakage protector according to the local code for wiring
4-The layout of power cable and signal cable should be orderly and not affecting each other.
C Switch on after finishing all wiring construction and re-checking.
8