Aqua PRO ECO550 Manual de instalação e do utilizador - Página 10

Procurar online ou descarregar pdf Manual de instalação e do utilizador para Bomba de calor Aqua PRO ECO550. Aqua PRO ECO550 20 páginas. Swimming pool heat pump
Também para Aqua PRO ECO550: Manual de instalação e do utilizador (20 páginas)

Aqua PRO ECO550 Manual de instalação e do utilizador
discharged from the bottom. Please hold the drainage nozzle
(accessory) into the hole and attach it well, then connect a pipe to
drain the condensation water out.
B. Wiring
1) Connect to appropriate power supply; the voltage should comply
with the rated voltage of the products.
2) Heater must be grounded.
3) Wiring must be handled by a professional technician according to
the circuit diagram.
4) Set leakage protector according to the local code for wiring (leakage
operating current ≤ 30mA).
5) The layout of power cable and signal cable should be orderly and
not interfere with each other.
C. Switch on after finishing all wiring construction and
re-checking.
9