Dell 6100 Instalação do bastidor - Página 28
Procurar online ou descarregar pdf Instalação do bastidor para Servidor Dell 6100. Dell 6100 34 páginas. Dell poweredge 4200 servers: installation guide
Também para Dell 6100: Instalação do bastidor (37 páginas), Manual suplementar (4 páginas), Manual do hardware (15 páginas)
(Rev. 9/8/00) FILE LOCATION: S:\SYSTEMS\MARCONI\Rackingd\7U\05KCEa00\05KCEeb0.fm
14
Rack Installation Guide
Installing the Cable Tray
Attach the cable tray to the PowerEdge computer chassis using five 6-32 x 0.25-inch
hex-head Phillips screws (see Figure 11).
NOTICE: The cable tray and its mounting are not sturdy enough to support
the weight of the PowerEdge chassis, so do not grasp the cable tray when
lifting the system. You should lift the system only by the chassis edges.
Figure 11. Installing the Cable Tray
Installing the Cable-Management Arm
You can install the cable-management arm on either side of the cable tray. See the
section "Reversing the Cable-Management Arm Installation" found later in this guide.
1.
Facing the back of the rack cabinet, attach the right-angle bracket of the cable-
management arm to the cabinet's back vertical rail and secure it with the captive
thumbscrews (see Figure 12). The bracket slides into the square mounting holes
on the vertical rail.
DELL CONFIDENTIAL - Preliminary
cable tray
6-32 x 0.25-inch hex-head
Phillips screws (5)
9/8/00