Dell PowerEdge 2900 Manual - Página 9

Procurar online ou descarregar pdf Manual para Servidor Dell PowerEdge 2900. Dell PowerEdge 2900 26 páginas. Tower-to-rack conversion guide
Também para Dell PowerEdge 2900: Informações de instalação (11 páginas), Manual de instalação (14 páginas), Manual de instalação (10 páginas), Atualização (2 páginas)

Dell PowerEdge 2900 Manual
Rack Stabilizer Feet
CAUTION:
Before installing systems in a rack, install front and side stabilizers on stand-alone racks or the front
stabilizer on racks joined to other racks. Failure to install stabilizers accordingly before installing systems in a
rack could cause the rack to tip over, potentially resulting in bodily injury under certain circumstances.
Therefore, always install the stabilizer(s) before installing components in the rack.
CAUTION:
After installing system/components in a rack, never pull more than one component out of the rack on
its slide assemblies at one time. The weight of more than one extended component could cause the rack to tip
over and may result in serious injury.
The stabilizer feet help prevent the rack from tipping over when a system or other component is pulled out
of the rack with the slide assemblies fully extended. See the documentation provided with the rack cabinet
for instructions on installing and anchoring the stabilizer feet.

Installing the Tower-to-Rack Kit

Tower-to-Rack Kit Contents

The tower-to-rack kit includes the following items (see Figure 1-1):
One rack front plate
One rack bezel, complete with keylock and keys
Two rack ears with rack handles and thumbscrews
Thirty-four M3 x 8 black flathead T10 Torx screws
Eight 6-32 x 0.188 black flathead Phillips screws
Six 10-32 shoulder nuts
One chassis metal filler panel
Three chassis plastic filler panels
Replacement label for the control panel display
Tower-to-Rack Conversion Guide
7