Dell S4248FB-ON Manual de instalação - Página 21
Procurar online ou descarregar pdf Manual de instalação para Interruptor Dell S4248FB-ON. Dell S4248FB-ON 47 páginas. S4200-on series
Também para Dell S4248FB-ON: Manual de configuração (29 páginas)
Figure 9. Separate rails
Tool-less non-threaded mount installation
CAUTION:
Your switch is not NEBS Earthquake Z4-compliant if you this installation method.
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1
With the ReadyRails flange ears facing outward, place one rail between the left and right vertical posts. Align and seat the back flange
rail pegs in the back vertical post flange. In the following illustration, item 1 and its extractions show how the pegs appear in both the
square and nonthreaded round holes.
S4200-ON Series installation
21