Dell S6000-ON Manual de iniciação - Página 17

Procurar online ou descarregar pdf Manual de iniciação para Interruptor Dell S6000-ON. Dell S6000-ON 26 páginas. Open networking
Também para Dell S6000-ON: Manual de resolução de problemas (29 páginas), Manual de instalação (41 páginas)

Dell S6000-ON Manual de iniciação
Elevated ambient temperature — If you install the equipment in a closed rack
assembly, the operating temperature of the rack environment may be greater
than the room ambient temperature. Use care not to exceed the 40°C
maximum ambient temperature of the switch.
Reduced air flow — Install the equipment in the rack so that you do not
compromise the amount of airflow required for safe operation of the
equipment.
Reliable earthing — Maintain reliable earthing of rack-mounted equipment.
Pay particular attention to the supply connections other than the direct
connections to the branch circuit; for example, use of power strips.
Do not mount the equipment with the rear panel facing in the downward
position.

Installing the Dell ReadyRails System

The ReadyRails rack mounting system is provided to easily configure your rack
so that you can install your switch. Install the ReadyRails system using the 1U
tool-less method or one of three possible 1U tooled methods (two-post flush
mount, two-post center mount, or four-post threaded).
1U Tool-less Configuration (Four-Post Square Hole or Unthreaded Round Hole):
1 With the ReadyRails flange ears facing outward, place one rail between the
left and right vertical posts. Align and seat the rear flange rail pegs in the rear
vertical post flange. In
the square and unthreaded round holes.
14
Installation
Figure
4-1, item 1 shows how the pegs appear in both