EarthWay 0-52732-90399-9 Manual de instruções de montagem - Página 4

Procurar online ou descarregar pdf Manual de instruções de montagem para Espalhador EarthWay 0-52732-90399-9. EarthWay 0-52732-90399-9 8 páginas. 100lb stainless steel ice melt spreader

Assembly and Operation Instructions 
 
Places the bearings into the lower frame 
Step 6:
using the "notch" on the bearing to fit into the 
"notch" on the LOWER AXLE FRAME.   Next slide the 
axle through the bearings, through the GEAR BOX 
and into the other LOWER AXLE FRAME.  Next, install 
AXLE BUSHING onto the axle, by placing the smaller 
end in first, slide over the AXLE, past the drilled 
holes.   
  
NOW GO BACK AND TIGHTEN ALL NUTS AND BOLTS STARTING WITH FIRST STEP. DO NOT OVER TIGHTEN. 
Install DRIVE WHEEL onto the AXLE and align 
Step 7:
with the cotter pin hole nearest to LOWER HANDLE as 
shown. Insert 2" cotter pin through wheel and through 
AXLE. Bend with pliers to prevent pin from falling out. 
Install COAST WHEEL onto the AXLE fully, then 
Step 8:
using outside cotter pin hole, insert 1" cotter pin through 
AXLE (not thru the wheel). Bend with pliers to prevent 
pin from falling out. 
 
 
New for 2021 EarthWay listened to customers who desired an adjustable handle for taller operators. 
Step 9:
Select three ¼" x 2" bolts and three nylon lock nut to complete this step.   
Notice that the square handle shaft has two sets of holes in both ends.  The end that the holes are closest to the end 
of the handle shaft is the top.  Place it as shown inbetween the handles.  
Start by bolting through the handle spacer using the top most handle bar hole.  Then bolt the gauge & lever assembly 
through the two center holes using two of your ¼" x 2" bolts.   
TIGHTEN ALL HARDWARE. 
90399_M52162_Oct_2021.docx 
 
 
PAGE 4