360 Yield 360 Y-DROP HAGIE ALUMINUM BOOM Manual de instruções - Página 3

Procurar online ou descarregar pdf Manual de instruções para Equipamento agrícola 360 Yield 360 Y-DROP HAGIE ALUMINUM BOOM. 360 Yield 360 Y-DROP HAGIE ALUMINUM BOOM 12 páginas.

ESTABLISH
I.
DROP LOCATIONS
Figures 1 and 2
Step 1
Locate the center of the machine and
identify the location of all the drops. On
the sprayer boom, mark where each riser
mount will be located. This will ensure
that the extension tubes will not interfere
with the riser mounts.
Figure 3
Step 2
For the primary boom; starting at the
wing fold pivot pin, measure out and
make marks at 30", 88", 148", 208"
and 280" (all measurements are ±5").
Repeat for the other primary boom.
INSTRUCTIONS 360 Y-DROP
Figure 1
Figure 2
30"
88"
148"
208"
280"
Figure 3
360YIELDCENTER.COM
HAGIE ALUMINUM BOOM
3