360 Yield 360 Y-DROP HAGIE STS 90 Manual de instruções - Página 5
Procurar online ou descarregar pdf Manual de instruções para Equipamento agrícola 360 Yield 360 Y-DROP HAGIE STS 90. 360 Yield 360 Y-DROP HAGIE STS 90 11 páginas. Steel booms
INSTALL CENTER SECTION
III.
EXTENSION TUBE
Figures 6 and 7
Step 1
With the threads pointing down, install
4" diamond U-bolt (1) over the OEM
center section boom.
Step 2
Position diamond boom clamp (2), 14"
top plate (3), bracket assembly (4) as
shown in Figure 7, and install the 3/8"
flange nuts (5).
Step 3
Install extension tube (6) onto bracket
assembly (4).
Step 4
Install boom bracket (7).
Figure 8
Step 5
Install a carriage bolt and nut (1) on
the front and rear of the 14" top plate.
Step 6
Install stainless steel set screw and
jam nut assembly (2).
INSTRUCTIONS 360 Y-DROP
HAGIE STS 80', 90' & 100' STEEL BOOMS
Figure 6
2
3
5
Figure 7
2
Figure 8
360YIELDCENTER.COM
1
4
7
6
1
5