360 Yield 360 Y-DROP MILLER Manual de instruções - Página 7

Procurar online ou descarregar pdf Manual de instruções para Equipamento agrícola 360 Yield 360 Y-DROP MILLER. 360 Yield 360 Y-DROP MILLER 12 páginas.

INSTALL 360 Y-DROP
IV.
BOOM
Figure 11
Step 1
Assemble 5' boom sections (1) using the
8" boom connectors (2) and the supplied
hardware.
Hardware Bag CC
Step 2
Repeat Step 1 as needed in order to
assemble the entire 360 Y-DROP boom.
Step 3
Set the 360 Y-DROP boom assembly
onto boom bracket (3).
Repeat Steps 1 -3 for the remaining boom assemblies.
CAUTION: The 360 Y-DROP boom assembly may
weigh up to 150 lbs. (68 kg). Exercise caution and
enlist help for this process.
Figure 12
Step 4
In order to span the full length of the
center section 360 Y-DROP boom, you
will need to cut and drill one of the 5'
boom sections to 1' . Mount this 1' section
between two full 5' boom sections. Drill a
7/16" through hole centered 2" from the
outside edge.
Figures 13 and 14
Step 5
Install square U-bolt (1), the 5/16" extra
thick washers, and the 5/16" nuts over
the 360 Y-DROP boom (2).
Hardware Kit A
Step 6
Install stop bolt (3) at both the front and
the rear of the extension tube. Repeat for
remaining stop bolts.
Hardware Kit B
Step 7
Install stainless steel set screw and
jam nut assembly (4). See Figure 11 for
detail. Repeat for the remaining mount
assemblies on the primary boom.
INSTRUCTIONS 360 Y-DROP
3
Figure 11
Figure 12
2
3
4
Figure 13
4
Figure 14
360YIELDCENTER.COM
MILLER
NEW HOLLAND
2
1
1
7