Burley Turbo Small Instruções de instalação e manual do utilizador - Página 4
Procurar online ou descarregar pdf Instruções de instalação e manual do utilizador para Fogão a lenha Burley Turbo Small. Burley Turbo Small 7 páginas. Turbo series
If the stove is not on an outside wall or the direct air supply method cannot be used, an air vent must be
supplied in the room in which the stove is fitted.
The sizes of the vents required are:
Small, 0- 550mm sq.(25mm diameter) Medium,1650mm sq.(50mm diam.) Large,4950mm Sq.(100mm diam.)
Only permanently open vents can be used and consideration should be given to draught when the stove is not
in use. Site these vent carefully. The vent covers should comply with Building Regulations Part J and should be
sited where they cannot be blocked.
Chimneys
All 3 models require a chimney of minimum 6" diameter (150mm) and a minimum length of 4 metres and they
must comply with Building Regulations J. Never share the flue with another appliance.
Without a chimney to these specifications there could be insufficient draw on the chimney to pull sufficient
oxygen through the appliance to make it burn properly.
If you live in a valley or are surrounded by tall trees or buildings you might experience downdraught problems
where the wind tries to stop the fumes rising up the chimney. An anti-downdraught cowl might help, but anti-
downdraught cowls reduce draw, so will not work on single storey chimneys and those with insufficient draw.
We recommend you seek the advice of a HETAS or NACE registered supplier and installer before purchasing
any stove or heating appliance.
Assembly & installation of the stove fire bricks and baffle plates.
Having positioned your Burley Turbo stove & connected it to a chimney with flue pipe, (we recommend 1mm
stainless steel pipe sprayed matt black) you need to assemble the inside parts.
There are 5 inside components, top and lower baffles, 2 side cheeks & a rear brick.
Place the top baffle loosely in position resting on the back square steel columns.
Place the left hand side brick in place, followed by the right hand. The top baffle can then be placed correctly
and the rear brick inserted.
Finally when these parts are snugly in position with the top baffle as far to the back as it will go, the lower
stainless steel baffle can be positioned resting on the front ledge.
When sweeping the chimney or carrying out regular maintenance on the stove, reverse the above procedure,
clean the chimney and the top surface of the top baffle and the stainless steel mesh, then reposition all the
components.
Commissioning of the Thornhill Turbo Appliance
On completion of the installation, when any fire cement or paint used has dried, the stove can be lit, a smoke
'bomb' should be burnt and all joints checked for smoke leakage and the chimney draw checked with all doors
and windows closed.
Please leave the instructions with the customer and inform them;-