Burlington chaplin r12 chr Instruções de instalação - Página 5
Procurar online ou descarregar pdf Instruções de instalação para Aquecedor Burlington chaplin r12 chr. Burlington chaplin r12 chr 5 páginas.
Dual source connect to central heating system and with a summer
electric heating kit
Parts required:
The diagrams of control valve, the connecting pipe and the summer electric heating kit as shown above are
for reference only, and should be purchased separately.
Connect to the electric supply via a fused spur. Then check for leaks. At all times follow the installation
instructions supplied with the Summer Electric Heating kit. All electric work must be done by a suitably
qualified person.
If this radiator used as a dual source connected to central heating system and with a summer
electric heating kit fitted:
● While use central heating system, power supply must be shut off, and release the air in radiator
as described in page 3.
● While use summer electric heating kit only, turn off the inlet and outlet valves, and make sure the
liquid in the radiator is approximately 90% - failure to do this will lead to leaking as radiator rusts
from the inside, more than 90% liquid will lead to leaking as liquid expands as it heats up. And
release the air in radiator as described in page 4.
2x
2x
5 - 5
1x
B