AquaStar Pipeline Pumps PLP150S Manual de instalação, operação e serviço

Procurar online ou descarregar pdf Manual de instalação, operação e serviço para Bomba para piscina AquaStar Pipeline Pumps PLP150S. AquaStar Pipeline Pumps PLP150S 2 páginas. Approved smart pipeline pumps

Installation Operation and Service Manual
IMPORTANT SAFETY INSTRUCTIONS
The Pipeline Communication Module can only be used when working with a Smart Pipeline Pump
Approved Smart Pipeline Pumps:
PLP300S, PLP150S, PLP300S-SVRS, PLP150S-SVRS
Before installing the Communication Module, switch OFF power to the pump and
load center by disconnecting power at the circuit breaker.
MOUNTING
The Pipeline Communication Module should be mounted to a secure flat surface within the low voltage compartment
of the pool's load center.
Drill and anchor two bolts or screws to the secure flat surface corresponding to the Communication Module's
mounting locations.
WIRING TO CONTROLLER (COMMUNICATION MODULE TO CONTROLLER)
Measure the "TO CONTROLLER" white cable length needed to run from the PLCM to an available RS485 connector
within the Controller Load Center.
Trim the white cable to length and strip the 4 wire ends back ¼".
Install the 4 wires into the RS485 connector and tighten the screw terminal to secure. Follow the wiring diagram based
on the controller brand being used (see Figure 1).
FIGURE 1
®
®
*Pentair
and Jandy
are registered trademarks of Pentair Flow Services AG and Zodiac Pool Systems, LLC., respectively
Rev: 071922