Axminster AWDWSG Manual do utilizador - Página 9

Procurar online ou descarregar pdf Manual do utilizador para Moedor Axminster AWDWSG. Axminster AWDWSG 20 páginas. 150/200mm wetstone grinder

Tool jig assembly
Step 3. Mount the Tool Jig assembly by sliding it onto the support bar as illustrated above.
Please read the section entitled Identification and Description of Parts, in order for
you to understand the terminology that we will use, so that you may better
understand the working and capability of your grinder. Keep this manual to hand for
reference for any other personnel that may be required to use the grinder.
Having assembled all the grinder attachments loosely, the machine now has to be set up
correctly and all the attachments securely fastened.
Place the grinder on a flat level surface.
Position the tool rest leaving a gap of approximately one and a half millimetres between the
grindstone and the rest, with the rest horizontal (preferably) tighten the star nut securely.
(See fig 4)
!
Remember to adjust the tool rest as the grindstone wears down.
Adjust the spark guard until it is just clear of the grindstone; fasten the fixing bolt securely.
(See fig 5)
!
Remember to adjust the spark guard as the grindstone wears down.
Initial Assembly...
Step 3

Setting up the Grinder...

Continues on next page....
W
A X M I N S T E R
W H I T E
09