Arch Pulsar 3 series Manual do operador - Página 5

Procurar online ou descarregar pdf Manual do operador para Sistemas de filtragem de água Arch Pulsar 3 series. Arch Pulsar 3 series 16 páginas.

Following the procedure outlined below will ensure a smooth start-up of the Pulsar 3 Chlorinator. For
seasonal operation, perform this procedure each spring.
IMPORTANT!!
Do NOT put Pulsar Plus Briquettes in the chlorinator during the start-up operation
Inlet Water Flow
e inlet water fl ow system is designed to provide a steady side-stream of clean fi ltered pool water to the
chlorinator.
1. Switch on the pool recirculation system and open all valves to the chlorinator.
2. Check the fl ow indicator (if present) of the Pulsar system to see that water is fl owing into the
chlorinator
3. Check to see that the three nozzles are
spraying water onto the Briquette-Tank grid
and water is fl owing from Solids Removal
Manifold.
4. Check all lines leading to the Chlorinator
for leaks. hand tighten all fi ttings if any leaks
are found.
Outlet Water Flow
e fl oat on the Discharge Valve rises with
the water level and allows the pump suction
to draw the chlorinated water into the pool's
recirculation system as the Discharge Tank fi lls
with water. When the water level drops, the
fl oat falls, shutting o
Valve also contains a check valve to prevent
pool water from backing up into the Discharge
Tank. Use the following procedure to ensure
that the outlet water fl ow system is operating
properly.
1. With the briquette hopper and defl ection
plate of the chlorinator temporarily out
of the way, fi ll the Discharge Tank with
su cient water to open the Discharge Valve
- use a hose or pail.
2.
e fl oat should rise, opening the Discharge
Valve, allowing water to be drawn out by
the Pulsar evacuation system (or venturi on
2" or less piping).
3. Check the system for leaks. If small air
bubbles are visibly moving, there may be
an air leak. Tighten the connections and
make sure the tubing is properly installed in
the fi ttings. (NOTE: Air bubbles near the
Pulsar 3 Chlorinator body that do not move
are normal and do not indicate leaks.)
4. Check to see that water is fl owing through
both nozzles of the solids removal system.
5. Check for air leaks after the Discharge
Valve closes.

Pre Start-Up Checklist

e Discharge
– 2 –
Briquette
Grid
Spray
Manifold
Defl ection
Plate
Emergency
Shut-Off
Float
Inlet fl ow
Outlet Flow
to Venturi
Discharge
Valve
Briquette
Tank
Discharge
Float
Solids Removal
Manifold