Cres Cor H138NPS1832CLA Instruções de utilização e manutenção - Página 2

Procurar online ou descarregar pdf Instruções de utilização e manutenção para Equipamento comercial para alimentos Cres Cor H138NPS1832CLA. Cres Cor H138NPS1832CLA 5 páginas. Pass-thru hot cabinet series

5925 Heisley Road • Mentor, OH 44060-1833
877/CRES COR (273-7267) • 440/350-1100
Fax: 440/350-7267 • www.crescor.com
OPERATING and MAINTENANCE INSTRUCTIONS
Model H138NPS1813CLA and H138NPS1832CLA

HOW TO INSTALL UNIT:

1. Place cabinet on level floor.
2. Plug cord into proper wall outlet.
HOW TO START UNIT:
1. Turn POWER switch to ON.
The yellow light will turn on.
2. Turn thermostat to #10.
3. Preheat cabinet for 30 minutes.
4. Put food into cabinet.
5. Turn thermostat to #8 ½ and close door.
No. 8 setting = approx. 185°F (85°C)
No. 6 setting = approx. 160°F (71°C)
No. 4 setting = approx. 130°F (54°C)
NOTE: Proper food holding temperature is
140°F/60°C or higher.
Pass-thru Hot Cabinet Series
Pass-thru
Holding Cabinet
Rev. 3 (9/04)
TO TURN OFF UNIT:
Turn the POWER switch to OFF.
The yellow light will go out.
FL-2254LA
2 of 5
Page