Cisco 4900M - Catalyst Switch Manual de instalação - Página 2

Procurar online ou descarregar pdf Manual de instalação para Interruptor Cisco 4900M - Catalyst Switch. Cisco 4900M - Catalyst Switch 8 páginas. 10/100base-t
Também para Cisco 4900M - Catalyst Switch: Manual de resolução de problemas (6 páginas)

Cisco 4900M - Catalyst Switch Manual de instalação
VME Card Cage
2
The following is a high-level list of steps for removing the 10Base-T ethernet
hub and installing the 10/100Base-T ethernet hub.
1) Using the necessary software commands, prepare the test system for
hardware installation.
2) Halt the computer and turn the system off.
3) Remove the service side test system covers.
4) Detach the AD958 user power panel sitting in front of the module
mounting cage.
5) Disconnect all cables from the 10Base-T ethernet hub.
6) Remove the 10Base-T ethernet hub.
7) Install the 10/100Base-T ethernet hub.
8) Reconnect cables.
9) Reattach the AD958 user power panel.
10) Replace the test system covers.
11) Turn on main and test system power.
12) Verify hardware installation.
13) Run checkers.
10/100Base-T Hub
IEEE Bus Extender
Module Mounting Cage
10/100Base-T Ethernet Hub Location -- Service Side
Catalyst 10/100Base-T Ethernet Hub Upgrade