Shimano BB-R9100 Manual do Concessionário - Página 18
Procurar online ou descarregar pdf Manual do Concessionário para Acessórios para bicicletas Shimano BB-R9100. Shimano BB-R9100 21 páginas. Front chainwheel
Também para Shimano BB-R9100: Manual do Concessionário (21 páginas)
INSTALLATION
Installation of the crank
(C)
(z)
(A)
4
(B)
Push in the stopper plate and check that
the plate pin is securely in place, and
then tighten the bolt of the left crank
arm.
Tighten both bolts equally to the
specified tightening torque (12 - 14 N·m).
(z)
The illustration is of the left crank
arm (cross-section)
18
(A)
Plate pin
(B)
Stopper plate
(C)
Left crank arm
Tightening torque
12 - 14 N·m
NOTE
•
The two bolts should be tightened at the
same time rather than each bolt being fully
tightened separately.
•
Set the stopper plate in the correct
direction as shown in illustration.