Actron A23909 Instruções de montagem - Página 3

Procurar online ou descarregar pdf Instruções de montagem para Equipamento de teste Actron A23909. Actron A23909 5 páginas. Latch assy - double paddle, double bolt

REV
DATE
A23909
OMEGA SERIES
CORONA, CALIFORNIA
NC 9/21/12
ASSEMBLY
INSTRUCTIONS
STEP 3
GLUE RUBBER BUMPER INTO HANDLE CAVITY AS SHOWN.
REPEAT FOR OPPOSITE HANDLE.
6
STEP 4
PLACE BOTH HANDLE ASSEMBLIES IN SLOTS OF
GUIDE BOLT. COMPRESS TORSION SPRINGS AND PLACE
IN CORRECT SLOTS INSIDE HANDLES.
ALIGN HOLES IN HANDLES AND GUIDE.
INSERT PIN THROUGH BOTH HANDLES, TORSION SPRINGS,
AND GUIDE. STAKE BOTH ENDS OF PIN SO IT CANNOT FALL OUT.
BE SURE TO PLACE APPROPRIATE TORSION
SPRING LEG INTO RECESS IN GUIDE BOLT.
5
18
17
STEP 5
PLACE SMOOTH CAM AND ROLLER IN APPRORIATE
BOLT SLOT AS SHOWN. INSERT ROLL PIN THRU HOLE
IN BOLT AND SLOT IN SMOOTH CAM. INSERT GROOVE
PIN INTO HOLE IN BOLT AND THRU HOLE IN ROLLER. MAKE
SURE PINS ARE FLUSH OR BELOW SURFACE OF BOLT ON
BOTH SIDES.
9
12
13
SHEET 3 OF 5