Bitstorm Bad Boy Xtreme BB-XABC75 Manual de instalação e operação - Página 4

Procurar online ou descarregar pdf Manual de instalação e operação para Antena Bitstorm Bad Boy Xtreme BB-XABC75. Bitstorm Bad Boy Xtreme BB-XABC75 17 páginas.

Bitstorm Inc.

Chapter 1 - Bench Test

Check off items as completed.
Step 1
Remove the protective cap from Antenna connector and attach to Xtreme.
Finger tight is adequate. Do not over tighten.
Step 2
(Do this step if an optional Unleashed or Unleashed HP
DUO comes pre-configured with Port 2 PoE disabled. If Unleashed is included,
power injection must be enabled on Port 2. To enable Port 2 power:
Open the case by removing the four screws from the back of the Power In-
jector DUO.
Move BOTH jumpers
Jumpers come factory configured to positions
Port 2.
NOTE: Both jumpers must be positioned identically.
Close case and refasten four screws on back.
Port 2 Power Enabled
Step 3
Connect power to DUO using either AC or DC.
Plug in an AC Adapter (included with M-POE-DUO-S15.5) with proper
AC
rating and insert barrel plug into DUO`s power connector.
Connect the Power Cable (included) to an appropriate power source.
DC
Connect the red (or white striped) wire to positive(+) and the solid
black wire to negative(-). Insert barrel plug into DUO.
Verify that the Green LED is lit on Port 1 (and Port 2 if enabled in Step 2).
Note: If Yellow Power Fault LEDs illuminate, it indicates a reverse polarity
connection. In this condition, circuit protection will prevent power being
applied to either Port 1 or Port 2.
4
is included as part of your system)
JP1
and
JP2
www.bitstorm.com
to position
1-2
to enable power on Port 2.
2-3
which disables power on
Port 2 Power Disabled
Bad Boy Xtreme