Siemens SINAMICS G120P VSD Manual de iniciação - Página 25

Procurar online ou descarregar pdf Manual de iniciação para Equipamento industrial Siemens SINAMICS G120P VSD. Siemens SINAMICS G120P VSD 50 páginas.

Siemens SINAMICS G120P VSD Manual de iniciação
Ramp up time
Set the time, in seconds, in which the motor should accelerate from
standstill up to the maximum RPM set in P1082.
1. Press
to modify the parameter value.
2. Using the
and
decrease the displayed value.
3. Press
to confirm the selected value. The display will
automatically display the next parameter in the commissioning
sequence.
Ramp down time
Set the time, in seconds, in which the motor should decelerate from
maximum RPM (P1082) down to a standstill.
1. Press
to modify the parameter value.
2. Using the
and
decrease the displayed value.
3. Press
to confirm the selected value. The display will
automatically display the next parameter in the commissioning
sequence.
Finish
Confirms the end of the commissioning process. The Inverter will
perform a motor calculation change all the relevant parameters
within the Control Module
1. Press
to modify the parameter value.
2. Using the
and
3. Press
to confirm the selection and complete the
commissioning process.
Busy
The display during the process of changing the parameter
information of the Inverter will display "BUSY".
Done
When the commissioning process is completed, the BOP-2 will
display "DONE". If a problem has occurred or there has been an
interruption to the final process then the BOP-2 will display
"FAILURE". Should this happen, the Inverter is to be considered
unstable and the reason for the failure should be investigated and
the commissioning process restarted.
At this point you are ready to test the motor. Refer back to point 5 in the Commissioning Steps on page 19.
Page 25 of 50
keys (or digit-by-digit method) increase or
keys (or digit-by-digit method) increase or
keys to select Yes or No.
Building Technologies
Last Revised: 4/11/2011