Siemens VALVEGYR LDU11.523A17 Manual do utilizador - Página 11

Procurar online ou descarregar pdf Manual do utilizador para Unidade de controlo Siemens VALVEGYR LDU11.523A17. Siemens VALVEGYR LDU11.523A17 22 páginas. Valve proving system for automatic shutoff valves ldu11...

Siemens VALVEGYR LDU11.523A17 Manual do utilizador

Sequence diagram

A
a
I
b
III
IV
t4
a
V
b
VI
a
b
VII
a
VIII
b
t6
a
IX
b
a
XI
b
XIII
a
b
AR
Program indication
Legend
t1
22.1 s
First test phase with atmospheric pressure
t2
27 s
Second test phase with gas pressure
For LDU11.323...
t3
2.5 s
Filling the test space
t4
2.5 s
Evacuating the test space
For LDU11.523...
t3
5 s
Filling the test space
t4
5 s
Evacuating the test space
t5
66.3 s
Total duration of valve proving test until burner is released
t6
7.4 s
Interval from start to energizing working relay (AR)
t20 22.1 s
Running time of programming mechanism until it switches itself off in the operating = start position (idle steps)
A
Gas valves controlled to evacuate the test space
B
Gas valves controlled to fill the test space
C
Vent valve, normally open; closed during valve proving test from the beginning of «Test1»
Building Technologies Division
t5
t1
t3
Test1
B
t2
Test2
C
7
t20
5
9
9
10
11
15
11
12
Output terminals
controlled by the
control unit or
electrically
connected
7696b01e/0601
CC1N7696en
20.04.2016
8
6
11/21