Ricoh G056 Boletim Técnico - Página 13
Procurar online ou descarregar pdf Boletim Técnico para Acessórios para impressoras Ricoh G056. Ricoh G056 46 páginas. Envelope feeder
Também para Ricoh G056: Manual de instalação (1 páginas), Manual de instalação (1 páginas)
Model:
Model K-P1
Firmware modified to correct the following:
1. After a job is canceled from a Unix terminal, the NIB cannot print any print jobs
sent from the network.
2. Bi-directional communication over TCP port 9100 is not possible.
3. The NIB stopped LPR printing after user "root" deleted all the spooled jobs.
4. The NIB stopped LPR printing following an input timeout.
5. A PS error report ("io error") is sometimes printed out during data
communication with the NIB when using AppleTalk from a Mac terminal.
Change in Specification:
The word "Emulation" was changed to "Printer Language" in the listed information
displayed by the info command.
Firmware modified to correct the following problem.
1. LPR printing through Mac OS X server was not possible. (Note that Mac OS X
server is not officially supported.)
2. The Web Status Monitor had a spelling mistake. ("decomes" ! "becomes")
3. The last page of a print job from Dazel system (TCP port 9100) was not ejected
immediately.
4. Disconnecting the Ethernet cable sometimes did not result in a timeout error.
5. TCP/IP setup page in the Web Status Monitor did not check some invalid IP
address and subnet mask settings.
6. DHCP lease period became 0 (zero) when Solaris 2.6 was used as a DHCP
server.
7. A user name longer than 8 characters caused garbage characters to display in
the "prnlog" result. This does not have any adverse influence on print results.
8. Protocol Up/Down settings were sometimes not activated after a change was
made.
Change in Specification:
The NIB logs Timeout error in IPP printing in "syslog".
Firmware modified to correct the following problem.
1. The NIB did not retrieve the infinite lease period setting from the NetWare 5
DHCP server.
2. NIB buffer overflow when Remote Printer Mode was selected.
3. The Web Status Monitor did not have the correct link to IPP Authentication and
Password Change pages.
4. Localized wordings appeared after the NIB reset was modified.
Change in Specification:
None
T
B
echnical
Descriptions
ulletin
Date:
15-May-01
PAGE: 2/2
No.:
RG058005
Version
1.49
1.48
1.47