CABINETS TO GO Findley & Myers OC3384SD Instruções de montagem - Página 3
Procurar online ou descarregar pdf Instruções de montagem para Mobiliário de interior CABINETS TO GO Findley & Myers OC3384SD. CABINETS TO GO Findley & Myers OC3384SD 4 páginas. Double oven cabinet
If the OC you are installing runs the length of your ceiling height, it is
recommended to assemble the unit standing to avoid scraping your ceiling.
Instructions:
►
1.
Put the Back Panel (E) face up on a flat soft working surface to ensure that the surface is not scratched
or damaged. Attach the drawer rail holders (c) to the pre-spotted areas using the supplied screws. (Figure 1)
c
Qty 6
Installing the Side Panels: Insert the right and left side panels (B) into the grooves of the back panel
2.
(D) and align the cam lock connectors. (Figure 2) Lock the cam lock with a screwdriver by turning the screw 180°
clockwise. (Figure 3)
Installing the Toe Kick (F): Place the toe kick (F) at the end of side panels (B). Align each cam lock on the
3.
toe kick and lock them. (Figure 4)
Install the Top & Bottom Panels (C & D) by sliding them in to the grooves.
4.
Install the face frame (A) by placing cam lock side down onto the box of the cabinet. (Figure 6) Align all
5.
grooves and cam locks onto the face frame and coordinating cam locks. It may be necessary to open all
cabinet doors. Lock all face frame cam locks with a screwdriver. (Figure 3)
NOTICE
E
Figure 1
B
Figure 2
F
C
C
C
A
Page 3
Figure 3
B
Figure 4
D
D
B
Figure 5
Figure 6
Top
c