Cisco ASA 5506-X Manual de instalação - Página 29

Procurar online ou descarregar pdf Manual de instalação para Hardware de rede Cisco ASA 5506-X. Cisco ASA 5506-X 46 páginas. Threat defense reimage guide
Também para Cisco ASA 5506-X: Manual de início rápido (10 páginas), Manual de início rápido (14 páginas), Manual de configuração fácil (11 páginas), Manual do software (37 páginas), Montar e ligar (12 páginas), Montar o chassis (10 páginas), Manual de instalação do hardware (26 páginas)

Cisco ASA 5506-X Manual de instalação
Installation Preparation
See
Hardware Specifications, on page 11
When planning the site layout and equipment locations, consider the information in the next section to help
avoid equipment failures and reduce the possibility of environmentally caused shutdowns. If you are currently
experiencing shutdowns or unusually high error rates with your existing equipment, these considerations may
help you isolate the cause of failures and prevent future problems.

Site Considerations

Considering the following helps you plan an acceptable operating environment for the chassis, and avoid
environmentally caused equipment failures.
• Electrical equipment generates heat. Ambient air temperature might not be adequate to cool equipment
• Ensure that the chassis cover is secure. The chassis is designed to allow cooling air to flow effectively
• Always follow the ESD-prevention procedures described previously to avoid damage to equipment.

Power Supply Considerations

When installing the chassis, consider the following:
• Check the power at the site before installing the chassis to ensure that it is "clean" (free of spikes and
• Install proper grounding for the site to avoid damage from lightning and power surges.
• The chassis does not have a user-selectable operating range. Refer to the label on the chassis for the
• Install an uninterruptible power source for your site, if possible.

Rack Configuration Considerations

Consider the following when planning an equipment-rack configuration:
• If you are mounting a chassis in an open rack, make sure that the rack frame does not block the intake
• The rack-mounting posts need to be 2 to 3.5 mm thick to work with the slide rail rack mounting.
• Front and rear doors—If your rack includes closing front and rear doors, the doors must have 65 percent
Online Only
to acceptable operating temperatures without adequate circulation. Ensure that the room in which you
operate your system has adequate air circulation.
within it. An open chassis allows air leaks, which may interrupt and redirect the flow of cooling air from
the internal components.
Damage from static discharge can cause immediate or intermittent equipment failure.
noise). Install a power conditioner, if necessary, to ensure proper voltages and power levels in the appliance
input voltage.
correct appliance input-power requirement.
or exhaust ports.
open perforated area evenly distributed from top to bottom to permit adequate airflow.
Cisco ASA 5506-X, ASA 5506W-X, and ASA 5506H-X Hardware Installation Guide
for information about physical specifications.

Site Considerations

25