Cisco 2500 Series Manual de iniciação - Página 14

Procurar online ou descarregar pdf Manual de iniciação para Servidor Cisco 2500 Series. Cisco 2500 Series 47 páginas. Wireless controller
Também para Cisco 2500 Series: Manual de instalação (12 páginas), Manual de configuração (19 páginas), Manual de implantação (23 páginas), Manual de configuração (50 páginas)

Cisco 2500 Series Manual de iniciação
Installing the Controller
Figure 6
1
2
After the controller is mounted on the wall, perform the following tasks to complete the installation:
Step 3
For configuration instructions about using the CLI setup program, see the
Step 4
and Power-On Self Test" section on page

Mounting the Controller on a Wall (Mounting Screws)

When mounting the 2504 controller on a wall using mounting screws, always mount the controller with
the front panel facing down.
Warning
Read the wall-mounting carefully before beginning installation. Failure to use the correct hardware
or to follow the correct procedures could result in a hazardous situation to people and damage to the
system. Statement 378
To mount the controller on a wall using mounting screws, follow these steps:
Mark the location of the mounting screws on the wall. Use the mount hole locations on the back of the
Step 1
controller for placement of the mounting screws
a cross-hatch mark.)
Cisco 2500 Series Wireless Controller Getting Started Guide
14
Mounting the Controller on the Wall
1
Front panel (facing down)
#10-32 flat head screws
Connecting the Controller Console Port
Securing the Power Adapter Cable
Connecting to the Network
2
3
3
Wall mounting screws
20.
(Figure
7). (The mount holes are shown in
"Running the Bootup Script
Figure 7
with